Solar & BESS Developers

Solar and battery storage are the fastest-growing segments of U.S. energy infrastructure. But that growth has created a challenge: interconnection queues have lengthened, study timelines stretch, and utility technical requirements have become more complex. Our engineers have worked both sides of interconnection. We understand what utilities need in an impact study, what causes delays, and how to prepare technical packages that move through review.

How We Support This Industry

  • DER impact studies for solar, BESS, and hybrid projects
  • System impact and facility studies for utility interconnection
  • Hosting capacity analysis and screening reviews
  • Non-wires alternative analysis
  • Protection coordination for DER interconnection points
  • Utility coordination and technical package preparation